Pro
Plan change
Change plan, billing period or seats and see the money first: credit for unused days, what is due today and what every period costs after. Upgrades start now; downgrades wait for the period to end and list what will be lost.
pnpm dlx shadcn@latest add @caliper/plan-changeChange plan
You’re on Team, 8 seats, billed monthly. 22 days left in this period.
When to use
Use it for
- The upgrade and downgrade step of any subscription product.
- Seat-based plans where the total moves with the team.
Skip it when
- Choosing a plan before signing up; use the pricing table.
Installation
pnpm dlx shadcn@latest add @caliper/plan-change
Adds its 12 files to components/ui/, each with its own stylesheet, and installs their packages. Pro installs with your access token, set up once per project. See Pro access. The first part also adds Caliper UI’s tokens; import them once as in Installation.
Usage
Import it from your copy of the source. The example behind the preview comes with the source. It is built from prorate and PlanChange.
import { prorate, PlanChange } from "@/components/ui/plan-change"
The worked example comes with Pro
The 37-line example behind the preview opens here, ready to copy.
- 626 Pro parts, blocks and page templates, all with source
- $149 once, with lifetime updates. No renewal
- A full refund within 14 days if it is not for you
API reference
prorate
component
PlanChange
component
Accessibility
It exposes alert and status semantics, with aria-labelledby, aria-label, aria-hidden and aria-live kept in step with state. Changes that matter are announced through a live region.
No custom key handling; Tab and the native activation keys do the work.
Motion
Transitions use the shared duration and easing tokens. Under prefers-reduced-motion those tokens collapse to instant and travel distances go to zero, so state changes still happen without movement.
Related
- Billing screenPlan, usage and money: the next invoice itemised before it is charged, usage with its cost at this pace, and failed invoices with a pay action.
- Finance homeWhere finance starts the day: cash across every entity and currency in one reporting total, lines to match, claims to approve and invoices past due, and each entity's progress through the close.
- Finance reconcileBank reconciliation: each line beside the invoices or bills that could settle it, with the reasons in words; tick several to balance it, small FX differences booked for you, rules for next time, and undo.